Skip to content

Don't run det setup if too short#363

Open
mmccrackan wants to merge 3 commits into
mainfrom
260310_det_setup
Open

Don't run det setup if too short#363
mmccrackan wants to merge 3 commits into
mainfrom
260310_det_setup

Conversation

@mmccrackan
Copy link
Copy Markdown
Collaborator

@mmccrackan mmccrackan commented Mar 10, 2026

If a det setup is only being run due to the cadence (i.e detectors are set up, no boresight rotation or elevation change and not a cal observation) and the scan is too short, do not run detector setup and just run the scan as is. This will catch cases where a remainder scan (~10-20 min) will want to do a detector setup, but will get completely cut leaving an empty spot. It should not be possible to get several of these cases in a row.

Also trims the ends of the blocks to the constraint if they go beyond it. Previously, the block was only cut after pre-ops were calculated, so the above detector setup could still get scheduled.

@mmccrackan mmccrackan requested a review from kmharrington March 11, 2026 17:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant