[ibm-fusion-access] Add OCP 4.21 and Component Readiness variants#72016

Merged
openshift-merge-bot[bot] merged 1 commit intoopenshift:masterfrom
amp-rh:ibm-fusion-access-operator-variants
Dec 17, 2025
Merged

[ibm-fusion-access] Add OCP 4.21 and Component Readiness variants#72016
openshift-merge-bot[bot] merged 1 commit intoopenshift:masterfrom
amp-rh:ibm-fusion-access-operator-variants

Conversation

@amp-rh
Copy link
Contributor

@amp-rh amp-rh commented Dec 1, 2025

Add CI configurations for IBM Fusion Access Operator tests with OCP 4.21 support and Component Readiness reporting for CI analytics.

Jira Tickets

Dependencies

New CI Configurations

Config Description
ibm-fusion-access-operator-ocp4.21-lp-interop.yaml Base test for OCP 4.21
ibm-fusion-access-operator-ocp4.20-lp-interop-cr.yaml Component Readiness for OCP 4.20
ibm-fusion-access-operator-ocp4.21-lp-interop-cr.yaml Component Readiness for OCP 4.21

Component Readiness Features

  • Run on schedule (0 3,15 * * *) for regular CI data collection
  • Use firewatch-ipi-aws-cr workflow for reporting integration
  • Include custom IBM must-gather post step
  • Use FIREWATCH_CONFIG_FILE_PATH for standard LP-interop failure rules
  • Set OCP_VERSION and REPORTPORTAL_CMP environment variables
  • Include verify-cluster step for JUnit test results

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Dec 1, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 1, 2025

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 5, 2025

/pj-rehearse periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-cr-ibm-fusion-access-operator-cr-ocp421

@openshift-ci-robot
Copy link
Contributor

@amp-rh: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Contributor

@amp-rh: job(s): periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-cr-ibm-fusion-access-operator-cr-ocp421 either don't exist or were not found to be affected, and cannot be rehearsed

@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 8, 2025

/pj-rehearse periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.20-lp-interop-ibm-fusion-access-operator-ipi-ocp420

@openshift-ci-robot
Copy link
Contributor

@amp-rh: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Contributor

@amp-rh: job(s): periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.20-lp-interop-ibm-fusion-access-operator-ipi-ocp420 either don't exist or were not found to be affected, and cannot be rehearsed

@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 8, 2025

/test ?

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 8, 2025

@amp-rh: The following commands are available to trigger required jobs:

/test app-ci-config-dry
/test boskos-config
/test boskos-config-generation
/test build01-dry
/test build02-dry
/test build03-dry
/test build04-dry
/test build06-dry
/test build07-dry
/test build08-dry
/test build09-dry
/test build10-dry
/test build11-dry
/test check-gh-automation
/test check-gh-automation-tide
/test ci-operator-config
/test ci-operator-config-metadata
/test ci-operator-registry
/test ci-secret-bootstrap-config-validation
/test ci-testgrid-allow-list
/test clusterimageset-validate
/test config
/test core-valid
/test generated-config
/test generated-dashboards
/test hosted-mgmt-dry
/test image-mirroring-config-validation
/test jira-lifecycle-config
/test labels
/test openshift-image-mirror-mappings
/test ordered-prow-config
/test owners
/test pr-reminder-config
/test prow-config
/test prow-config-filenames
/test prow-config-semantics
/test pylint
/test release-config
/test release-controller-config
/test rover-groups-config-validation
/test secret-generator-config-valid
/test services-valid
/test stackrox-stackrox-stackrox-stackrox-check
/test step-registry-metadata
/test step-registry-shellcheck
/test sync-rover-groups
/test verified-config
/test vsphere02-dry
/test yamllint

The following commands are available to trigger optional jobs:

/test build05-dry
/test check-cluster-profiles-config

Use /test all to run the following jobs that were automatically triggered:

pull-ci-openshift-release-check-gh-automation
pull-ci-openshift-release-master-ci-operator-config
pull-ci-openshift-release-master-ci-operator-config-metadata
pull-ci-openshift-release-master-ci-operator-registry
pull-ci-openshift-release-master-config
pull-ci-openshift-release-master-core-valid
pull-ci-openshift-release-master-generated-config
pull-ci-openshift-release-master-ordered-prow-config
pull-ci-openshift-release-master-owners
pull-ci-openshift-release-master-prow-config-filenames
pull-ci-openshift-release-master-prow-config-semantics
pull-ci-openshift-release-master-release-controller-config
pull-ci-openshift-release-master-step-registry-metadata
pull-ci-openshift-release-master-step-registry-shellcheck
pull-ci-openshift-release-openshift-image-mirror-mappings
pull-ci-openshift-release-yamllint
Details

In response to this:

/test ?

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 8, 2025

/pj-rehearse periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.20-lp-interop-cr-ibm-fusion-access-operator-cr-ocp420

@openshift-ci-robot
Copy link
Contributor

@amp-rh: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@amp-rh amp-rh force-pushed the ibm-fusion-access-operator-variants branch from 5744dc1 to 47ae5e6 Compare December 9, 2025 20:54
@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 9, 2025

/retitle [ibm-fusion-access] Add OCP 4.21 and Component Readiness variants

@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 9, 2025

/hold cancel

@openshift-ci openshift-ci bot changed the title Add OCP 4.21 and Component Readiness variants for ibm-fusion-access-operator [ibm-fusion-access] Add OCP 4.21 and Component Readiness variants Dec 9, 2025
@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 9, 2025

/wip cancel

@amp-rh amp-rh marked this pull request as ready for review December 9, 2025 20:56
@openshift-ci openshift-ci bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Dec 9, 2025
@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 9, 2025

/pj-rehearse ack

@openshift-ci-robot
Copy link
Contributor

@amp-rh: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Dec 9, 2025
@amp-rh amp-rh force-pushed the ibm-fusion-access-operator-variants branch from 47ae5e6 to a341b32 Compare December 9, 2025 21:15
@openshift-ci-robot openshift-ci-robot removed the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Dec 9, 2025
@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 9, 2025

/pj-rehearse ack

@openshift-ci-robot
Copy link
Contributor

@amp-rh: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Dec 9, 2025
@dfrazzette
Copy link
Contributor

If this PR is adding periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-ibm-fusion-access-operator-ipi-ocp421 version, should we also run rehearsal for it?

@openshift-merge-robot openshift-merge-robot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Dec 17, 2025
…perator

Add CI configurations for IBM Fusion Access Operator tests with OCP 4.21
support and Component Readiness reporting for CI analytics.

New CI Configurations:
- ibm-fusion-access-operator-ocp4.21-lp-interop.yaml: Base test for OCP 4.21
- ibm-fusion-access-operator-ocp4.20-lp-interop-cr.yaml: Component Readiness for OCP 4.20
- ibm-fusion-access-operator-ocp4.21-lp-interop-cr.yaml: Component Readiness for OCP 4.21

Component Readiness variants:
- Run on schedule (0 3,15 * * *) for regular CI data collection
- Use firewatch-ipi-aws-cr workflow for reporting integration
- Include custom IBM must-gather post step
- Use FIREWATCH_CONFIG_FILE_PATH for standard LP-interop failure rules
- Set OCP_VERSION and REPORTPORTAL_CMP environment variables
- Include verify-cluster step for JUnit test results
@amp-rh amp-rh force-pushed the ibm-fusion-access-operator-variants branch from a341b32 to e698f1f Compare December 17, 2025 14:20
@openshift-merge-robot openshift-merge-robot removed the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Dec 17, 2025
@openshift-ci-robot openshift-ci-robot removed the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Dec 17, 2025
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@amp-rh: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
pull-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.20-lp-interop-cr-images RedHatQE/interop-testing presubmit Presubmit changed
pull-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-cr-images RedHatQE/interop-testing presubmit Presubmit changed
pull-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-images RedHatQE/interop-testing presubmit Presubmit changed
periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-cr-ibm-fusion-access-operator-cr-ocp421 N/A periodic Periodic changed
periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.20-lp-interop-cr-ibm-fusion-access-operator-cr-ocp420 N/A periodic Periodic changed
periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-ibm-fusion-access-operator-ipi-ocp421 N/A periodic Periodic changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 17, 2025

/pj-rehearse periodic-ci-RedHatQE-interop-testing-master-ibm-fusion-access-operator-ocp4.21-lp-interop-ibm-fusion-access-operator-ipi-ocp421

@openshift-ci-robot
Copy link
Contributor

@amp-rh: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Dec 17, 2025
@dfrazzette
Copy link
Contributor

/pj-rehearse ack

@openshift-ci-robot
Copy link
Contributor

@dfrazzette: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Dec 17, 2025
@amp-rh
Copy link
Contributor Author

amp-rh commented Dec 17, 2025

/assign @rabin-io

Copy link
Contributor

@rabin-io rabin-io left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 17, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: amp-rh, dfrazzette, rabin-io

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Dec 17, 2025
@openshift-merge-bot openshift-merge-bot bot merged commit f339fb8 into openshift:master Dec 17, 2025
15 of 16 checks passed
@amp-rh amp-rh deleted the ibm-fusion-access-operator-variants branch December 18, 2025 14:13
sjug pushed a commit to sjug/release that referenced this pull request Jan 30, 2026
…perator (openshift#72016)

Add CI configurations for IBM Fusion Access Operator tests with OCP 4.21
support and Component Readiness reporting for CI analytics.

New CI Configurations:
- ibm-fusion-access-operator-ocp4.21-lp-interop.yaml: Base test for OCP 4.21
- ibm-fusion-access-operator-ocp4.20-lp-interop-cr.yaml: Component Readiness for OCP 4.20
- ibm-fusion-access-operator-ocp4.21-lp-interop-cr.yaml: Component Readiness for OCP 4.21

Component Readiness variants:
- Run on schedule (0 3,15 * * *) for regular CI data collection
- Use firewatch-ipi-aws-cr workflow for reporting integration
- Include custom IBM must-gather post step
- Use FIREWATCH_CONFIG_FILE_PATH for standard LP-interop failure rules
- Set OCP_VERSION and REPORTPORTAL_CMP environment variables
- Include verify-cluster step for JUnit test results
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants