docs: add Phase 2 implementation plan and rename Phase 1 for consistency#1804
Conversation
17e4f43 to
dec5b86
Compare
Site previewPreview: https://83924d54-site.fullsend-ai.workers.dev Commit: |
dec5b86 to
9003658
Compare
ReviewFindingsNo findings. The correctness sub-agent (opus) completed successfully and confirmed this is a pure documentation change with no code modifications — zero correctness surface area. Three sonnet-tier sub-agents (style-conventions, intent-coherence, docs-currency) failed to launch due to model unavailability on the Vertex deployment. The orchestrator independently verified that all references to the renamed file ( Previous runReviewFindingsNo findings. Two sonnet-tier sub-agents (style-conventions, docs-currency) failed to launch due to model unavailability on the Vertex deployment. The correctness sub-agent (opus) completed successfully and confirmed this is a pure documentation change with no code modifications. The orchestrator independently verified that all references to the renamed file ( Previous run (2)ReviewFindingsNo findings. Three sonnet-tier sub-agents (style-conventions, intent-coherence, docs-currency) failed to launch due to model unavailability on the Vertex deployment. The correctness sub-agent (opus) completed successfully and confirmed this is a pure documentation change with no code modifications. The orchestrator independently verified that all references to the renamed file ( |
waynesun09
left a comment
There was a problem hiding this comment.
Review Squad Report (1 HIGH, 8 MEDIUM)
Agents dispatched: 7 (2x claude-coder, 2x claude-researcher, 2x gemini-code-review, 1x cursor-code-review)
Verified findings: 9 MEDIUM+ (4 false positives removed from raw agent output)
Inline comments below on each finding.
9003658 to
6bb8159
Compare
ralphbean
left a comment
There was a problem hiding this comment.
waynesun09's squad caught the important stuff — agreed with all 9 findings (thumbs-up'd each). Two small additional notes inline.
6bb8159 to
c53d279
Compare
Add implementation plan for Phase 2 of ADR-0038 (transitive dependency resolution). Rename the existing Phase 1 plan to -phase1 for consistent naming. Cross-references added between the plans and from ADR-0038. Signed-off-by: Greg Allen <gallen@redhat.com> Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
c53d279 to
bbe38fc
Compare
Summary
universal-harness-access-implementation.mdtouniversal-harness-access-phase1.mdfor consistency with the new Phase 2 namingTest plan
🤖 Generated with Claude Code