Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
14 changes: 14 additions & 0 deletions docs/guides/lab-assembly/msi-b850.md
Original file line number Diff line number Diff line change
Expand Up @@ -92,6 +92,20 @@ Connect the RTE SPI header to the platform as described in the table:

![msi_b850_spi](images/msi_b850_spi.jpg)

## Optional: RTE Mounting and Cable Management

Where space and setup conditions allow, it is recommended to mount the RTE
directly to the motherboard using nylon standoffs and screws, as shown in the
picture below. This approach improves the overall stability of the test stand
and reduces the risk of accidental disconnections during testing.

![msi_b850_rte_mounted](images/msi_b850_rte_mounted.jpg)

Additionally, it is advisable to secure the connection cables by routing and
fastening them along the RTE board. Proper cable management minimizes strain
on the connectors and helps prevent intermittent contact issues that could
affect test reliability.

### Complete Setup

After preparing all of the connections also three activities should be