Skip to content

build(deps): Bump actions/download-artifact from 7 to 8 #53

build(deps): Bump actions/download-artifact from 7 to 8

build(deps): Bump actions/download-artifact from 7 to 8 #53

Status Failure
Total duration 1m 5s
Artifacts

python-ci.yml

on: push
Matrix: Lint and Test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Lint and Test (3.13)
The strategy configuration was canceled because "build-and-test._3_10" failed
Lint and Test (3.11)
The strategy configuration was canceled because "build-and-test._3_10" failed
Lint and Test (3.14)
The strategy configuration was canceled because "build-and-test._3_10" failed
Lint and Test (3.10)
Process completed with exit code 1.
Lint and Test (3.12)
The strategy configuration was canceled because "build-and-test._3_10" failed
Lint and Test (3.12)
The operation was canceled.