When creating the first Fuse project, a lot of time is required mainly downloading artefacts. (can be 15-20 minutes even with reasonable connection speed).
I'm wondering if it would be possible to "hide" this time in the installer when installing Fuse Tooling.
Would it be possible?
What do you think?