Parent epic: #273 · Spec: docs/superpowers/specs/2026-05-20-codex-pivot.md §9 row 12, §11 (#M)
Scope
Survey post-release for repositories using glitchwerks/github-actions@v2 uses: pins. Notify each consumer of the breaking-change nature of v3 and the upcoming GHCR image deletions (#L).
Method
- GitHub dependency-graph search for
uses: referencing glitchwerks/github-actions@v2 or @v2.x.x
- Cross-check via
mcp__github__search_code for glitchwerks/github-actions in .github/workflows/** (acknowledge per feedback_github_code_search_false_negatives.md that this surface has known false-negatives — combine with direct enumeration of known consumer repos)
- Notify each consumer via GitHub Issue on their repo or direct comment on a relevant PR
Acceptance
- Audit report (consumer list + notification status) committed to
docs/codex-pivot-consumer-audit.md or added as a comment on this issue
- Every consumer either notified or confirmed-defunct
Gating role
Audit completion gates the start of the 30-day GHCR-deletion grace window in #L. This decouples release timing from audit completion per §9 row 12 — the cutover can proceed against the OAuth deadline (~2026-06-20) without this becoming a release blocker.
🤖 Generated by Claude Code on behalf of @cbeaulieu-gt
Parent epic: #273 · Spec:
docs/superpowers/specs/2026-05-20-codex-pivot.md§9 row 12, §11 (#M)Scope
Survey post-release for repositories using
glitchwerks/github-actions@v2uses:pins. Notify each consumer of the breaking-change nature ofv3and the upcoming GHCR image deletions (#L).Method
uses:referencingglitchwerks/github-actions@v2or@v2.x.xmcp__github__search_codeforglitchwerks/github-actionsin.github/workflows/**(acknowledge perfeedback_github_code_search_false_negatives.mdthat this surface has known false-negatives — combine with direct enumeration of known consumer repos)Acceptance
docs/codex-pivot-consumer-audit.mdor added as a comment on this issueGating role
Audit completion gates the start of the 30-day GHCR-deletion grace window in #L. This decouples release timing from audit completion per §9 row 12 — the cutover can proceed against the OAuth deadline (~2026-06-20) without this becoming a release blocker.
🤖 Generated by Claude Code on behalf of @cbeaulieu-gt