Parent epic: #273 · Spec: docs/superpowers/specs/2026-05-20-codex-pivot.md §9, §11 (#H)
Scope
Final cutover step after all Claude workflows are removed. Remove claude-pr-review/quality-gate (and the shadow variant) from the main-branch ruleset's required-status-check list.
Acceptance
claude-pr-review/quality-gate no longer listed as required
claude-pr-review/quality-gate-shadow no longer listed as required
codex-pr-review/quality-gate (from #B) remains the sole gate
- Ruleset change documented in shadow-mode decision log (#N)
Gating
- MUST wait for #O (synchronize-event verification) — do NOT delete
claude-pr-review.yml without #O's answer
- Shadow-mode decision-gate criteria from spec §8 met (≥7 days AND ≥7 PRs binding, kill-criteria not triggered)
🤖 Generated by Claude Code on behalf of @cbeaulieu-gt
Parent epic: #273 · Spec:
docs/superpowers/specs/2026-05-20-codex-pivot.md§9, §11 (#H)Scope
Final cutover step after all Claude workflows are removed. Remove
claude-pr-review/quality-gate(and the shadow variant) from themain-branch ruleset's required-status-check list.Acceptance
claude-pr-review/quality-gateno longer listed as requiredclaude-pr-review/quality-gate-shadowno longer listed as requiredcodex-pr-review/quality-gate(from #B) remains the sole gateGating
claude-pr-review.ymlwithout #O's answer🤖 Generated by Claude Code on behalf of @cbeaulieu-gt