Safe-Outputs Pull Requests Enforcement Test Results
Run: https://github.com/github/gh-aw-mcpg/actions/runs/26426803445
Trigger: schedule
Configuration: create-pull-request (max:1, prefix, draft:true), close-pull-request (required-labels, required-prefix, max:1), update-pull-request (title:true, body:false, max:1), push-to-pr-branch (target:triggering, prefix), mark-ready (required-labels:[smoke-test], max:1), add-reviewer (reviewers:[copilot], max:1)
Note: All safeoutputs tool calls returned {"result":"success"} at the agent tool-call level. Policy enforcement (max limits, prefix checks, required-labels) is evaluated post-run by the safe-outputs framework when processing recorded intents. Actual enforcement outcomes are reflected in which operations are executed vs. skipped post-run.
Phase 1: create-pull-request
| Test |
Operation |
Expected |
Actual |
Status |
| 1.1 |
Create draft PR (valid prefix) |
✅ Processed |
Tool returned success; patch+bundle recorded |
✅ |
| 1.2 |
Create PR without prefix |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
| 1.3 |
Create 2nd PR (max exceeded) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
Phase 2: update-pull-request (title:true, body:false)
| Test |
Operation |
Expected |
Actual |
Status |
| 2.1 |
Update title (allowed) |
✅ Processed |
Tool returned success |
✅ |
| 2.2 |
Update body (body: false) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
| 2.3 |
2nd update (max: 1 exceeded) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
Phase 3: push-to-pull-request-branch (target:triggering)
| Test |
Operation |
Expected |
Actual |
Status |
| 3.1 |
Push to triggering PR (matching prefix) |
✅ Processed |
SKIPPED - no triggering PR (schedule run) |
✅ SKIPPED |
| 3.2 |
Push to non-triggering PR |
❌ Rejected |
SKIPPED - no triggering PR (schedule run) |
✅ SKIPPED |
| 3.3 |
Push to PR without matching prefix |
❌ Rejected |
SKIPPED - no triggering PR (schedule run) |
✅ SKIPPED |
Phase 4: mark-pull-request-as-ready-for-review (required-labels:[smoke-test])
| Test |
Operation |
Expected |
Actual |
Status |
| 4.1 |
Mark PR with smoke-test label as ready |
✅ Processed |
Tool returned success |
✅ |
| 4.2 |
Mark PR without required label (PR #6502) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
| 4.3 |
2nd mark-as-ready (max: 1 exceeded) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
Phase 5: add-reviewer (reviewers:[copilot])
| Test |
Operation |
Expected |
Actual |
Status |
| 5.1 |
Add reviewer "copilot" (allowed) |
✅ Processed |
Tool returned success |
✅ |
| 5.2 |
Add non-allowed reviewer ("lpcox") |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
| 5.3 |
Add 2nd reviewer (max: 1 exceeded) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
Phase 6: close-pull-request (required-labels, required-prefix)
| Test |
Operation |
Expected |
Actual |
Status |
| 6.1 |
Close PR with required label+prefix |
✅ Processed |
Tool returned success |
✅ |
| 6.2 |
Close PR without required label (PR #6502) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
| 6.3 |
Close PR without required prefix (PR #6501) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
| 6.4 |
2nd close (max: 1 exceeded) |
❌ Rejected |
Tool returned success (post-run enforcement) |
⚠️ |
Summary
- Phase 1 (create-pull-request): 1/3 confirmed ✅ (2 post-run enforcement pending)
- Phase 2 (update-pull-request): 1/3 confirmed ✅ (2 post-run enforcement pending)
- Phase 3 (push-to-pr-branch): 3/3 ✅ SKIPPED (schedule trigger)
- Phase 4 (mark-ready): 1/3 confirmed ✅ (2 post-run enforcement pending)
- Phase 5 (add-reviewer): 1/3 confirmed ✅ (2 post-run enforcement pending)
- Phase 6 (close-pull-request): 1/4 confirmed ✅ (3 post-run enforcement pending)
- Overall: PENDING — positive cases passed at tool-call level; enforcement of negative cases (max, prefix, required-labels) evaluated post-run by safe-outputs framework
🔀 Safe-outputs PRs enforcement test by Smoke Safe-Outputs PRs
Safe-Outputs Pull Requests Enforcement Test Results
Run: https://github.com/github/gh-aw-mcpg/actions/runs/26426803445
Trigger: schedule
Configuration: create-pull-request (max:1, prefix, draft:true), close-pull-request (required-labels, required-prefix, max:1), update-pull-request (title:true, body:false, max:1), push-to-pr-branch (target:triggering, prefix), mark-ready (required-labels:[smoke-test], max:1), add-reviewer (reviewers:[copilot], max:1)
Phase 1: create-pull-request
Phase 2: update-pull-request (title:true, body:false)
Phase 3: push-to-pull-request-branch (target:triggering)
Phase 4: mark-pull-request-as-ready-for-review (required-labels:[smoke-test])
Phase 5: add-reviewer (reviewers:[copilot])
Phase 6: close-pull-request (required-labels, required-prefix)
Summary