-
Notifications
You must be signed in to change notification settings - Fork 2
Finalize Power Box #13
Copy link
Copy link
Open
Labels
mechanicalRequires mechanical workRequires mechanical workstructuralRequires structural workRequires structural workwiringRequires wiring workRequires wiring work
Metadata
Metadata
Assignees
Labels
mechanicalRequires mechanical workRequires mechanical workstructuralRequires structural workRequires structural workwiringRequires wiring workRequires wiring work
Type
Fields
Give feedbackNo fields configured for issues without a type.
Currently the power distribution box simply has the previously constructed panel sitting in the bottom and wires coming out of the door
A large diameter conduit section should be placed between the motor driver box and power box for cable runs
The plate for wiring should be finished out and have appropriate wires run through it
The VFD and DINrail should be mounted appropriately in the box. Care should be taken to leave enough space for a Masso Controller if it is decided we should get the remote IO panel to simplify wiring to the HID