Skip to content

Lint

Lint #7518

Triggered via schedule March 5, 2026 01:31
Status Failure
Total duration 1m 23s
Artifacts

lint.yml

on: schedule
Matrix: build
completion-lint
4s
completion-lint
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build (3.13, ubuntu-latest, pre-commit)
Process completed with exit code 1.
build (3.13, ubuntu-latest, manual)
The strategy configuration was canceled because "build._3_13_ubuntu-latest_pre-c" failed
build (3.13, ubuntu-latest, manual)
The operation was canceled.
build (3.13, ubuntu-latest, pre-push)
The strategy configuration was canceled because "build._3_13_ubuntu-latest_pre-c" failed
build (3.13, ubuntu-latest, pre-push)
The operation was canceled.
build (3.13, windows-latest, pre-commit)
The strategy configuration was canceled because "build._3_13_ubuntu-latest_pre-c" failed
build (3.13, windows-latest, pre-commit)
The operation was canceled.
build (3.13, windows-latest, manual)
The strategy configuration was canceled because "build._3_13_ubuntu-latest_pre-c" failed
build (3.13, windows-latest, manual)
The operation was canceled.
build (3.13, windows-latest, pre-push)
The strategy configuration was canceled because "build._3_13_ubuntu-latest_pre-c" failed
build (3.13, windows-latest, pre-push)
The operation was canceled.
completion-lint
Process completed with exit code 1.